ADVERTISEMENT FOR BIDS TITLE: Adrian Elementary School Boiler Replacement

Legal Notice

ADVERTISEMENT FOR BIDS

00 03 00-1

SECTION 00 03 00

ADVERTISEMENT FOR BIDS

TITLE: Adrian Elementary School Boiler Replacement

LOCATION OF WORK: Adrian Elementary School

515 Oklahoma Avenue

Adrian, MN 56110

OWNER: Adrian School District – ISD#511

410 Indiana Avenue

Adrian, MN 56110

(507) 483-2266

OWNER’S

REPRESENTATIVE: ICS Consulting, Inc.

3890 Pheasant Ridge Drive NE, Suite 180

Blaine, MN 55449

(763) 354-2670

ENGINEER: Obermiller Nelson Engineering

1440 Van Buren St. NE, Suite 130

Minneapolis, MN 55413

(612) 249-5600

PROJECT DESCRIPTION:

Provide and install new hot water boilers and connect to existing hot water piping, chimney and electrical panels. Provide new propane piping and equipment from propane from tanks located on the West side of the school. Demo existing fuel oil piping. Work to be performed over the summer. Substantial completion date is on or before September 23, 2019.

BID DATE AND LOCATION:

Sealed bids will be received at Adrian School District Business Office, 410 Indiana Avenue, Adrian, MN 56110 then publicly opened and read aloud. Bids will be received and stamped-in prior to 3:00 PM local time on June 6th, 2019. Please check in at District Office.

EXAMINATION OF DOCUMENTS:

For Electronic access to the bidding documents and Adrian Elementary School Boiler Replacement project, please contact the Owner’s Representative at (763) 354-2670. The Owner’s Representative can also provide locations of Builders Exchange’s holding plans for contractors to access. Bidders are responsible for any and all costs associated with the production of plans and specifications for their use.

BIDDING REQUIREMENTS:

Each bidder must comply with the following requirements to reassure acknowledgment recognition of their bids:

ADVERTISEMENT FOR BIDS

00 03 00-2

Bids must be accompanied by bid security in form of certified check, cashier’s check, or bid bond in amount of 5% of base bid submitted, made payable to owner, as guarantee that bidder will, if awarded, enter into contract in accordance with contract documents and submitted bid.

Submit bid in duplicate on the prescribed form, which is furnished with the specification, with full name and address of the bidder.

Completely fill in all blank spaces on the Bid Form, in ink or typewriter, in both words and figures.

Sign in longhand, executed by a principal duly authorized to enter into an agreement. If a bidder is a co-partnership, then signatures on the bid shall be by an authorized member of the firm, with names and addresses of each member of partnership.

Base bid and all alternate bids shall be stated both in writing and in figures. In all cases, written and numerical figures must agree; otherwise at Owner’s option, it shall be cause for rejection of bid. Complete form without alteration.

Submit alternate prices (bid) for either increasing or decreasing the cost as called for on bid form and Description of Alternates. Submit a bid for all unit prices.

Owner may make such investigations as he deems necessary to determine the ability and responsibility of the bidder to perform the work, and any bidder shall furnish to Owner all such information and data for this purpose, as the Owner may request. Owner reserves the right to reject any bid if the evidence submitted by, or investigation of, such bidder fails to satisfy the Owner that such bidder is properly qualified to carry out the obligations of the contract and to complete the Work contemplated therein. The competence and responsibility of bidder will be considered in making an award, including, but not limited to: (1) proof of financial responsibility, (2) quality of similar work, (3) amount of experience with similar projects, (4) facilities, personnel and equipment, (5) reputation for performance, and (6) ability to complete the work within specified time. Owner reserves the right to reject any Bid where there is reasonable doubt as to the qualifications of the bidder.

Owner reserves the right to (1) accept bidder’s Base Bid only, (2) accept any one or more of bidder’s Alternate Bids, in any order regardless of the order in which they were listed, (3) reject all Bids, (4) award contract based on his investigation of bidders, as well as acceptance of alternates, all of which Owner deems to be in his best interest, (5) waive informalities or minor irregularities in bids and waive minor irregularities or discrepancies in bidding procedure.

Upon award of Contract, Contractor shall provide AIA A312 Performance and Payment Bonds in the amount of 100% of Contract Sum in accordance with General Conditions and Amendments to General Conditions.

BIDDING DOCUMENTS & SITE REVIEW:

Each bidder (including subcontract bidder where appropriate) is required to visit the site and to fully inform himself and record his own investigations as to the extent of the Work, the extent of the work performed by other contractors under other construction packages, conditions under which the Work is to be performed, existing buildings and streets, conditions of the area, existing utilities and other features, type of soil, available facilities and difficulties that may be encountered in connection therewith, and other relevant items which will affect his bid or the Work.

ADVERTISEMENT FOR BIDS

00 03 00-3

Prior to submitting a bid, each bidder is required to examine all of the bidding requirements, all Contract Documents, all drawings and specifications for the Project (including those primarily for other Subcontracts), become thoroughly familiar with the scope of the Project and all factors and items of work which will affect his bid or the Work, whether shown or specified in documents primarily for Work of others or Work of this Contract.

No extras will be allowed to the Contractor as a result of misunderstanding of the extent of scope of the Work as a result of his failure to study and record his own findings. Submission of a bid shall be proof that such examinations have been made and that bidder has recorded his own investigation and has become thoroughly familiar with all contract documents (including all addenda). The failure or omissions of any bidder to examine any form, instrument or document shall in no way relieve any bidder from any obligation in respect to his bid.

PRE-BID CONFERENCE:

A pre-bid conference will be held at 1:00 PM on Thursday, May 30, 2019 at Adrian Elementary School, 515 Oklahoma Avenue, Adrian, MN 56110. Please report to the Adrian School Office for the pre-bid walkthrough meeting. No extras will be allowed because of the bidder’s misinterpretation to the amount of work involved, bidder’s own error, negligence, or failure to examine the site. Attendance is not required but strongly recommended. Bidding contractor is responsible for the information presented at Pre-bid meeting.

START DATE:

Work may begin after receipt of the signed contract from the Owner. Pre-construction and submittals work related to the project is to commence immediately after receipt of the signed contract. Start date is expected to be June 14, 2019

SUBSTANTIAL AND COMPLETION DATE:

Owner requires work to be substantially complete on or before September 23, 2019. Milestone dates are listed in Summary of Work, Section 01 01 00. Bids shall reflect all costs necessary to meet this schedule requirement. Bids shall reflect all costs necessary to meet the schedule requirements.

END OF SECTION 00 03 00

05-22-19, 05-29-19, 06-05-19